Video: Painting Eurodam’s Hull

Roland | April 22, 2008 at 8:56 am | In Video, Views From the Yard, Construction Milestones |

For our first video posting, we have a brief clip from Chief Engineer Frank de Vries of shipyard personnel painting Eurodam’s hull. This is from a couple of weeks ago when Eurodam was in dry dock prior to the final phase of sea trials. The hull was cleaned and repainted with a nonpolluting epoxy to help it slip through the water and meet contracted speed requirements.

1 Comment »

RSS feed for comments on this post. TrackBack URI

  1. How exciting to see the progress. We can hardly wait until our sail in November!

    Comment by csingle509 — April 22, 2008 #

Leave a comment

Comments are moderated. The topic of this site is exclusively Eurodam. Everything else is off-topic. No profanity or harsh rhetoric, please.

You must be logged in to post a comment.

Powered by WordPress with Pool theme design by Borja Fernandez.
Entries and comments feeds. Valid XHTML and CSS. ^Top^